Electrical
Hook up a generator safely
by Edward J. Thunderbird
Interlock kit or transfer switch: the only safe ways to power your house.
DifficultyHire an electrician
TimeHalf a day (electrician)
Do it yourselfNot DIY
Hire a pro$500 to $1,500 for an interlock and inlet; $1,000 to $2,500 for a transfer switch
Signs of the problem
- Planning for power outages
- Using extension cords through windows
- Thinking about a "suicide cord" (do not)
How it works
A generator must never feed the house wiring while it is still connected to the utility: power flows back up the line and can kill line workers. An interlock kit on your main panel, or a transfer switch, makes it impossible to have both on at once. A licensed electrician installs either one and pulls the permit.
Tools and parts
Tools
- None for you; the electrician installs it
Parts and what they cost
| Part | Typical cost |
|---|---|
| Interlock kit for your panel | $80 to $200 |
| Generator inlet box and cord | $100 to $250 |
| Manual transfer switch (6 to 10 circuits) | $300 to $700 |
Total cost
| Cost | |
|---|---|
| Do it yourself | Not DIY |
| Hire a pro | $500 to $1,500 for an interlock and inlet; $1,000 to $2,500 for a transfer switch |
Costs are typical U.S. prices checked November 18, 2026; they vary by region and change often. Pro prices include labor. Fix Critical is not paid by any store or brand.
Step by step
Safety first
- Never use a double-male "backfeed" cord: it can electrocute you and line workers and start fires.
- Carbon monoxide: generator outside, CO alarms inside.
- Use a cord rated for the generator outlet (often 30 amp, L14-30).
- Size the generator: add up the running watts of what you need (well pump, fridge, furnace fan, lights) and the starting surge of the biggest motor.
- Have a licensed electrician install an interlock kit or transfer switch and an outdoor inlet box.
- In an outage: put the generator outside, at least 20 feet from doors and windows, and start it.
- Plug the cord into the inlet. Turn the MAIN breaker OFF, slide the interlock, and turn the GENERATOR breaker ON.
- Turn circuits on one at a time, biggest loads first.
- When power returns: generator breaker OFF, slide the interlock, MAIN breaker ON, then shut down the generator.
Maintenance: keep it from happening again
- Test the generator and the switch-over monthly.
- See Generator maintenance.
When to call a pro
Always: this is electrician work with a permit.